Delay notices from iTaoBuy, grouped by cause
Every notice iTaoBuy posted between June 2025 and October 2026 that changes how long a parcel takes, with the window it gives and one line in its own words.
Twenty-eight notices sorted by cause

iTaoBuy keeps one public notice list with two streams, promotions and logistics announcements. On 16 October 2026 it held 86 entries. We read all of them and kept the 28 that change how long a parcel takes or say something about paying for a delay. They are grouped below by cause, not by date, because the cause is what the exclusion clauses talk about.
Each entry shows the date iTaoBuy posted it, the window it describes and one sentence in iTaoBuy’s own words. Some notices are signed with a different date from the one the list shows (the Labour Day notice is signed 2025 but was posted in April 2026); we use the posted date. The originals are on the iTaoBuy notice list.
Grouping by cause also shows a pattern. Holiday notices are planned and give dates; airport and weather notices arrive after the event and rarely give a figure; capacity notices have a start and no end. Only one notice, about February 2026, says what buyers would receive. For a buyer waiting on a parcel, the planned notices are the useful ones: they tell you which days nothing ships.
Amsterdam and the European hubs

Three of the notices are about Amsterdam. In June 2025 a warehouse move there and a staff shortage held up the Europe Tariffless Line, Line-T and Line-TT for about a week, and iTaoBuy told buyers who had not yet picked a route to “carefully consider” those three. In October 2025 a ground-handling system failure at Schiphol on 21 October, and a KLM loading-system fault on 23 October, slowed pickups. In January 2026 a shortage of de-icing fluid grounded cargo flights.
None of the three route names from June 2025 appears in the October 2026 estimator; Europe now quotes DHL Duty-Free and EU Small Packages lines. Treat the old notice as history, not as a warning about today’s routes.
| Posted | Notice | Window | In iTaoBuy’s words |
|---|---|---|---|
| 2025-06-17 | Delays on the Europe Tariffless Line routes | 2025-06-17 to 2025-06-24 | “Based on the current situation, the delay is expected to last approximately one week.” |
| 2025-10-31 | Amsterdam airport ground-handling system failure | 2025-10-21 to 2025-10-31 | “due to a system failure at DNATA ground handling at AMS airport on October 21, multiple shipments experienced extended Notification of Arrival (NOA) times.” |
| 2026-01-08 | Amsterdam de-icing fluid shortage | 2026-01-08 to no end date given | “the airport is currently unable to provide de-icing services for cargo aircraft, leading to a significant number of last-minute cancellations for flights to and from the Netherlands.” |
Weather: two typhoons and a US winter

Super Typhoon Ragasa is the one weather notice with a number attached: parcels with an estimated shipping date from 22 to 25 September 2025 were expected to take 2 to 3 working days longer, and domestic returns paused until 27 September.
The September 2026 typhoon notice points at Fujian, Zhejiang, Jiangsu and Shanghai and gives 3 to 5 days for parcels to and from those areas, which is mostly the domestic leg before your parcel ships. The December 2025 USPS notice lists thirteen states hit by snow and allows up to 3 to 5 business days in remote areas, plus post office closures on 25 December and 1 January.
Weather is where the exclusion texts disagree in wording: the table says natural disasters, the claims rules say severe weather. See the exclusion wording page.
| Posted | Notice | Window | In iTaoBuy’s words |
|---|---|---|---|
| 2025-09-23 | Super Typhoon Ragasa | 2025-09-22 to 2025-09-25 | “for packages with an estimated shipping date between September 22 and September 25, the overall transit time is expected to be extended by 2-3 working days.” |
| 2025-12-11 | USPS winter weather and holiday closures | 2025-12-11 to 2026-01-02 | “Final delivery times may be delayed, with delays of up to 3–5 business days possible in some remote areas.” |
| 2026-09-03 | Typhoon on the south-east coast | 2026-09-03 to 2026-09-08 | “Parcels to and from these areas may experience 3–5 day delays.” |
Strikes in France, Canada and Belgium

Two notices are about strikes and a third mentions one in passing. The French notice of September 2025 named 10 September and possibly 18 and 27 September, and admitted that “specific delays cannot be estimated at this time”. The Canada Post notice says a nationwide strike began on 25 September 2025 and gives no end date. The March 2026 capacity notice adds a Belgian postal strike from 8 to 12 March.
Strikes appear by name in the claims rules’ list of events that do not earn delay compensation. They do not appear in the table’s own force majeure note. Both texts are quoted on the exclusion wording page.
| Posted | Notice | Window | In iTaoBuy’s words |
|---|---|---|---|
| 2025-09-04 | September strikes in France | 2025-09-10 to 2025-09-27 | “As the scope and duration of the strike remain unclear, specific delays cannot be estimated at this time.” |
| 2025-09-28 | Canada Post strike | 2025-09-25 to no end date given | “orders utilizing or expected to utilize Canada Post services may experience delays.” |
Holiday cut-offs and the National Day reversal

Holiday notices are the most common kind and the most practical. Most of them affect the days before a parcel ships, so they do not add to the delay count, but they decide when day 0 is. Typical lines: packages submitted after 17:00 on 31 December 2025 would ship from 2 January; during Labour Day 2026 the carrier was closed from 1 to 3 May and backlog shipped from 4 May; around Dragon Boat Festival the carriers paused from 19 to 21 June.
One pair contradicts itself. On 23 September 2026 iTaoBuy said the warehouse would close from 1 to 3 October and that parcels submitted after 17:00 on 29 September would ship on 5 October. On 26 September it posted a service update for 1 to 7 October: “No delays. No interruptions. Everything runs as usual.” The later notice is the one to follow, but both are still in the list.
Planning around these is simple once you know the pattern. The warehouse usually announces a last submission time, often 17:00 Beijing time the day before the break, and a first dispatch day after it. A parcel submitted an hour late can wait four or five days for day 0, and none of that wait counts toward the delay lines.
| Posted | Notice | Window | In iTaoBuy’s words |
|---|---|---|---|
| 2025-09-29 | National Day and Mid-Autumn holidays 2025 | 2025-10-01 to 2025-10-07 | “Our carrier will be closed and unable to accept parcels on October 6th.” |
| 2025-12-26 | Overseas public holidays, December and January | 2025-12-27 to 2026-01-06 | “our warehouse will suspend shipments on Wednesday, December 31, 2025.” |
| 2025-12-26 | New Year shipping cut-off | 2025-12-31 to 2026-01-02 | “All backlogged and newly received packages are expected to begin normal dispatch after 5:30 PM on the same day.” |
| 2026-02-03 | Lunar New Year service schedule | 2026-02-13 to 2026-02-24 | “iTaoBuy Service Schedule (February 13 – February 24, 2026)” |
| 2026-04-02 | Qingming, Easter and Canadian holiday | 2026-04-03 to 2026-04-06 | “All packages will be shipped collectively on April 6 (Monday).” |
| 2026-04-29 | Labour Day schedule | 2026-05-01 to 2026-05-04 | “Starting May 4, all backlogged packages will be processed and shipped in order.” |
| 2026-06-18 | Dragon Boat Festival schedule | 2026-06-19 to 2026-06-22 | “All backlogged packages will be processed and shipped in order starting on Monday, June 22.” |
| 2026-09-17 | Mid-Autumn Festival schedule | 2026-09-25 to 2026-09-28 | “On September 26–27, only receiving, custom photos, and rehearsal packing will be handled - no outbound shipping.” |
| 2026-09-23 | National Day 2026 shipping arrangement | 2026-10-01 to 2026-10-05 | “All packages submitted after 5:00 PM Beijing Time on September 29, 2026 will be dispatched on the morning of October 5, 2026 (Beijing Time).” |
| 2026-09-26 | National Day service update (replaces the 23 September plan) | 2026-10-01 to 2026-10-07 | “No delays. No interruptions. Everything runs as usual.” |
Warehouse power cuts

Two power cuts closed the warehouse in Guangdong. The first was planned: the industrial park announced a full-day outage for 21 December 2025, and iTaoBuy said parcels submitted before 18:00 on 20 December would leave as planned. The second, on 16 September 2026, was not; the restoration notice followed the next day and warned of “minor delays” while the backlog cleared.
Both happened before parcels shipped, so they move day 0 rather than lengthen transit. The September notice is signed “September 16, 20026”, a typing slip that is still on the page.
| Posted | Notice | Window | In iTaoBuy’s words |
|---|---|---|---|
| 2025-12-20 | Warehouse power cut on 21 December | 2025-12-21 to 2025-12-22 | “Parcels submitted on Dec 21 will be prioritized for processing immediately after power restoration on Dec 22.” |
| 2026-09-16 | Warehouse power cut | 2026-09-16 to 2026-09-17 | “Currently, all of the above operations are experiencing varying degrees of delay.” |
Capacity, conflict and paused routes

Seven notices are about capacity rather than a single event. From March 2026 the Middle East conflict paused routes to a dozen countries and, in iTaoBuy’s words, parcels transiting the Middle East to Europe would be affected “to varying degrees”. On 12 March iTaoBuy described disrupted air freight to Europe this way: “As these are force majeure circumstances, your understanding is highly appreciated.” That is the only notice in the list that uses the phrase force majeure about an ongoing delay.
On 26 March a fuel shortage at Shanghai airports cut cargo capacity; iTaoBuy said its DHL routes were not affected and that non-DHL parcels might see higher prices and longer transit. The June 2025 customs notice belongs here too, because it promised Worry-Free compensation for bulk customs detentions not caused by the recipient, wording that conflicts with the 2026 table’s exclusion note.
| Posted | Notice | Window | In iTaoBuy’s words |
|---|---|---|---|
| 2025-06-05 | Customs inspections in some Chinese cities | 2025-06-05 to no end date given | “itaobuy promises to compensate you in accordance with the official Worry-Free Shipping principles if there is a problem of bulk shipments being detained by customs that is not caused by the recipient's problem.” |
| 2025-12-22 | Peak-season delays | 2025-12-22 to no end date given | “the volume of parcels in logistics channels has surged significantly, leading to varying degrees of delays in transit, customs clearance, and last-mile delivery.” |
| 2026-03-02 | Middle East route suspensions | 2026-03-02 to no end date given | “parcels transiting through the Middle East to Europe will also be affected to varying degrees, and overall delivery times are expected to be extended.” |
| 2026-03-12 | Europe air freight disruption and Belgian postal strike | 2026-03-08 to no end date given | “As these are force majeure circumstances, your understanding is highly appreciated.” |
| 2026-03-24 | Postal export suspended to 11 destinations | 2026-03-24 to no end date given | “Effective March 24, our company will suspend the acceptance and delivery of export mail for the following destinations.” |
| 2026-03-26 | Shanghai airport fuel shortage | 2026-03-26 to no end date given | “As a result, non-DHL shipments may experience: … Longer transit times and delays” |
| 2026-06-23 | Postal routes to 27 EU countries suspended | 2026-06-24 to no end date given | “Temporary Suspension of Postal Routes to 27 EU Countries” |
The one notice that paid for a delay

The notice of 18 March 2026 is the only one in the list that offers anything. It apologises for February parcels delayed by flight cancellations over the Spring Festival “and other uncontrollable external factors”, notes that a few took more than 25 days, and asks affected buyers to contact customer service once the parcel is finally delivered. After checking, iTaoBuy would issue a special coupon to offset shipping on the next parcel.
Two details are worth noticing. The cause is described as uncontrollable, yet a coupon was offered anyway. And the contact line in the published text is an unfilled template slot where an email address or chat link was meant to go; online chat is the channel that exists.
What the notices leave unsaid

- Apart from the February apology, no notice says whether the delay it describes earns a coupon or a refund.
- No notice links to the 2026 compensation table, and the table does not refer back to any notice.
- Only one notice (12 March 2026) labels a delay force majeure; the others describe events without classifying them.
- Several notices name routes that the estimator no longer lists under those names, so a notice cannot always be matched to your route by name.
- No notice gives a resumption date for the paused postal routes to the EU or the Middle East.
That is why the late-parcel checker shows overlapping notices as context and leaves the payout question to the table.